Metro (Or.)
(Metro (Or.), 2004-11-03)
The Highway 217 Corridor Study is being completed in two phases.
The first phase developed and analyzed a wide range of multi-modal
alternatives. Based on this evaluation, the alternatives will be refined
to a smaller ...