Metro : Highway 217 corridor study (2004)

Show full item record

Title: Metro : Highway 217 corridor study (2004)
Author: Metro (Or.)
Abstract: The Highway 217 Corridor Study is being completed in two phases. The first phase developed and analyzed a wide range of multi-modal alternatives. Based on this evaluation, the alternatives will be refined to a smaller set that can be studied in more detail in the second phase. Options will be evaluated based on how well they address the study objectives in terms of travel performance, environmental and neighborhood effects, fi nancial feasibility, and cost effectiveness. [From the document]
Description: 19 pp. Bookmarks supplied by UO. Charts, tables, figures. Published November 3, 2004. Captured January 28, 2009.
URI: http://www.oregonmetro.gov/files/planning/217_report_11-03-04.pdf
http://hdl.handle.net/1794/9248
Date: 2004-11-03


Files in this item

Files Size Format View
Metro_217_report_11-03-04.pdf 259.8Kb PDF View/Open

This item appears in the following Collection(s)

Show full item record