Browsing Transportation plans by Author "David Evans and Associates"

Navigation

Display Options

Results

  • Halfway (Or.); H. Lee & Associates; David Evans and Associates (City of Halfway (Or.), 2001-06)
    "This project is partially funded by a grant from the Transportation and Growth Management (TGM) Program, a joint program of the Oregon Department of Transportation and the Oregon Department of Land Conservation and ...
  • Helix (Or.); David Evans and Associates; Umatilla County (Or.) (City of Helix (Or.), 2001-06)
    The Helix Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan constitutes ...
  • Hines (Or.); David Evans and Associates (City of Hines (Or.), 2001-05-08)
    The Hines Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the transportation element ...
  • Angelo Eaton & Associates; Oregon. Dept. of Transportation; Kittelson & Associates; Hood River (Or.); David Evans and Associates (City of Hood River (Or.), 2003-08-28)
    This Transportation Systems Plan (TSP) will guide the management of existing transportation facilities and the design and implementation of transportation facilities for the next 20 years. This transportation system plan ...
  • Huntington (Or.); H. Lee & Associates; David Evans and Associates (City of Huntington (Or.), 2001-06)
    The Huntington Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan ...
  • La Grande (Or.); Union County (Or.); Oregon. Dept. of Transportation; David Evans and Associates; Cogan Owens Cogan (Firm) (Oregon. Dept. of Transportation, 2006-03-29)
    The US 30: Gekeler Lane to I-84 Circulation and Access Management Plan (US 30 CAMP) describes existing traffic and land use patterns in the study area; identifies potential safety, access, and traffic congestion issues; ...
  • Lincoln City (Or.); David Evans and Associates (City of Lincoln City (Or.), 1995-01)
    The purpose of this Transportation Master Plan is to provide a dynamic guide for implementing the goals and objectives identified herein relative to improved transportation facilities and services in Lincoln City in to ...
  • Lostine (Or.); David Evans and Associates (City of Lostine (Or.), 1997-06)
    The Lostine Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan ...
  • Madras (Or.); David Evans and Associates; Breazeale, George; Madras (Or.). Dept. of Public Works; Oregon. Dept. of Transportation. Planning Section (City of Madras (Or.), 1998-08-25)
    The Madras Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan ...
  • Public Financial Management, Inc.; McMinnville (Or.); David Evans and Associates (City of McMinnville (Or.), 1993-10)
    The City of McMinnville (the City) has commenced the development of an updated Comprehensive Plan for the area within its Urban Growth Boundary. This Transportation Master Plan for the City constitutes the background ...
  • Medford (Or.); Oregon. Dept. of Transportation; David Evans and Associates (City of Medford (Or.), 2007-09-18)
    An Interchange Area Management Plan (IAMP) is a planning document used to help protect the investment in an interchange over the long-term. The IAMP for the South Medford Interchange (SMI) is required by Oregon Administrative ...
  • Milton-Freewater (Or.); David Evans and Associates; Eggers, Gina; Swirsky, Karen (City of Milton-Freewater (Or.), 1999-06)
    The Milton-Freewater Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System ...
  • Monument (Or.); David Evans and Associates (City of Monument (Or.), 1997-06)
    The Monument Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the transportation ...
  • Mosier (Or.); Cogan Owens Cogan (Firm); David Evans and Associates (City of Mosier (Or.), 2003-05-12)
    This plan is intended to help guide the future growth and development of Mosier, focusing specifically on future transportation facilities and development in downtown Mosier along the Historic Columbia River Highway ...
  • Mount Angel (Or.); David Evans and Associates; Seder Architects (City of Mount Angel (Or.), 2001-06)
    Mt. Angel wants to enhance and promote its downtown. The challenge has been to keep the downtown friendly and local while making it more attractive to visitors. The City recognized the need to coordinate and expand previously ...
  • Mount Vernon (Or.); David Evans and Associates (City of Mount Vernon (Or.), 1997-06)
    The Mt. Vernon TSP was prepared as part of an overall project in Grant County that involved preparing individual plans for Grant County and the six communities of: Dayville, Long Creek, Monument, Mt. Vernon, Prairie City, ...
  • Myrtle Point (Or.); David Evans and Associates (City of Myrtle Point (Or.), 1995-05)
    The City's Pedestrian and Bicycle Plan coordinates with state and federal plans. It describes a system that can be implemented over 20 years. The Plan is guided by the Myrtle Point Pedestrian and Bicycle Advisory ...
  • Philomath (Or.); Cogan Owens Cogan (Firm); David Evans and Associates (City of Philomath (Or.), 1999-05)
    This Philomath Transportation Systems Plan (TSP) contains a 20-year transportation systems plan for the Philomath area. It contains plans for the different transportation modes in Philomath to meet state planning requirements ...
  • Pilot Rock (Or.); David Evans and Associates (City of Pilot Rock (Or.), 2001-06)
    The City of Pilot Rock Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System ...
  • Port of Portland (Or.); Portland (Or.). Bureau of Planning; Jacobs Consultancy; Alcantar & Associates; Cephas, Inc.; David Evans and Associates; DKS Associates; NEXTOR; Parametrix, Inc.; Synergy Consultants; Zimmer Gunsul Frasca (Port of Portland (Or.), 2008-09)
    This technical memorandum summarizes the aviation demand forecasts prepared for the 2010 Portland International Airport Master Plan Update. This technical memorandum also provides historical data on the regional population ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics