  • Crescent Ranger District (Or.) (2002-09)
    Proposes to replace the current 4-culvert structure with a single, open-bottom arch structure. Includes removal of existing structure to streambed elevation, with embankment materials conserved and culverts removed from ...
  • Crescent Ranger District (Or.) (2001-04-04)
    Announces decision to implement Alternative 2 of the project EA, amending the Deschutes National Forest Land and Resource Management Plan (Forest Plan) to incorporate management direction changes. Changes emphasis on ...
  • Crescent Ranger District (Or.) (2001-01)
    Plan provides guidelines for two new management areas, one for each river corridor. Aims to protect and enhance the resource values which contribute to the current character of the rivers, and to maintain the current ...
  • Bend-Fort Rock Ranger District (Or.) (2003-05)
    Announces categorical exclusion of project replacing old toilet with a new barrier-free, wheelchair-accessible double toilet, which will meet the needs of a high-use trailhead, as well as current technology.
  • Deschutes National Forest (Agency : U.S.) (2008-09-30)
    Announces decision to authorize continued livestock grazing use within the Big Table and Lytle Creek Cattle Allotments consistent with existing management to continue to meet or move resources toward desired conditions.
  • Sisters Ranger District (Or.) (2006-12-08)
    Announces decision after review of project EA and public comments on the Preliminary Decision Memo, to implement proposed action felling fire-killed danger trees adjacent to Forest roads. Includes ground-based logging of ...
  • Sisters Ranger District (Or.) (2006-10-26)
    Announces decision to implement proposed action felling fire-killed danger trees adjacent to Forest roads. Includes ground-based logging of about 8 acres and 150 thousand board feet of killed ponderosa pine and white fir, ...
  • Sisters Ranger District (Or.) (2006-12-12)
    Announces decision to harvest about 2.25 million board feet of fire-killed timber from 201 acres from a fire of July 24, 2006. Dead trees of all species and heavily scorched white fir and lodgepole pine that have a low ...
  • Detroit Ranger District (Or.) (2007-01)
    Announces decision to implement Alternative 5 of the project EA, implementing timber harvest on approximately 751 acres, modified by converting some of the regeneration units to thinning units, and altogether dropping two ...
  • Detroit Ranger District (Or.) (2006-11)
    Proposes to harvest timber in overstocked, managed stands over 40 years-old and overstocked, 100 year-old fire regenerated stands on about 985 acres, with commercial thinning on 926 acres and regeneration harvest on 59 ...
  • Bend-Fort Rock Ranger District (Or.) (2007-06-25)
    Announces decision to issue a special use permit to BPA to construct a 140-foot communications tower within the existing BPA LaPine Substation. BPA will construct the tower and mount two microwave antennae onto the tower ...
  • Bend-Fort Rock Ranger District (Or.) (2003-08-11)
    Announces categorical exclusion of project replacing the 4-foot wide Bridge Creek bridge, which broke in the middle under heavy snow with a single log stringer bridge with handrails. Also includes replacing the aging Spring ...
  • Bend-Fort Rock Ranger District (Or.) (2002-04-10)
    Proposes to reconstruct 34 miles of existing trail, relocate approximately 2 trail miles that are located in areas of soil and erosion concern, construct about 3 miles of new mostly mountain bike trail, and provide signs ...
  • McKenzie River Ranger District (Or.) (2008-04-18)
    Announces decision to implement Alternative B of the project EA, to thin 2463 acres, yielding a gross estimate of 47.8 million board feet of wood products that would be sold over 3 years beginning in fiscal year 2008. The ...
  • McKenzie River Ranger District (Or.) (2008-03)
    Proposes to thin 2463 acres, yielding a gross estimate of 47.8 million board feet of wood products that would be sold over 3 years beginning in fiscal year 2008. The objectives would be to restore structural diversity in ...
  • Detroit Ranger District (Or.) (2003-04-14)
    Announces decision to decommission .8 miles of road, including Road 2234-175 and its spurs to revegetate with forage seed and transplant trees at the entrance, providing a more effective barrier to off-highway vehicle use. ...
  • Sisters Ranger District (Or.) (2001-10-01)
    Announces decision to implement Alternative 2 of the project EA, responding to the high mortality caused by the spruce budworm by thinning some 170,000 board feet of green trees on approximately 630 acres of forest stands ...
  • Lookout Mountain Ranger District (Or.) (2008-08)
    Proposes to reauthorize grazing and issue grazing permits for the Crystal Springs and Burn allotments, addressing the demand for livestock forage, and also the concerns over increased water temperature, decreased bank ...
  • McKenzie River Ranger District (Or.) (2005-05)
    Proposes to implement a Master Plan that identifies a variety of improvements proposed to upgrade facilities and services for campers, comply with Americans with Disabilities Act and other special requirements, enhance the ...
  • Bend-Fort Rock Ranger District (Or.) (2004-02)
    Proposes to expand campground facilities at Rock Creek and Gull Point campgrounds. Includes constructing campsite access roads, new campsites and associated facilities, camp spurs, water lines and faucets, toilet buildings, ...