Now showing items 12-28 of 28

    • Old Foley and North Bank gates project environmental assessment 

      McKenzie River Ranger District (Or.) (2005-05)
      Proposes gating roads 2638345 and 2600280, which would preclude motorized public access to 3.2 miles of road, at the request of Giustina Resources, who are concerned about human-caused fire.
    • Research vegetation control environmental assessment 

      Willamette National Forest (Agency : U.S.) (2008-07)
      The McKenzie River Ranger District (MRRD) on the Willamette National Forest (WNF) proposes to treat competing vegetation occupying research plots on approximately 5416 m2 with glyphosate. This treatment may occur at a ...
    • Santiam Pass summer motorized recreation project environmental assessment 

      McKenzie River Ranger District (Or.) (2007-12)
      Proposes to develop and implement formal management of OHV use within the Santiam Wagon Road and Sand Mountain Special Interest Areas, the Big Lake Campground Complex, and the Hoodoo Ski Area. Includes designating a system ...
    • Shadow salvage project decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2003-06)
      Announces decision to implement Alternative B of the project EA, because it satisfies the primary purpose and need to salvage commercially windthrown trees and portions of felled hazard trees in a timely manner while they ...
    • Shadow salvage timber sale environmental assessment 

      McKenzie River Ranger District (Or.) (2003-05)
      Proposes salvaging about 70 thousand board feet (MBF) of windthrown trees (about 15 log truck loads), felling about 31 hazard trees along the six-mile haul route as part of a timber sale contract intended to mitigate impacts ...
    • South Fork McKenzie River enhancement project decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2007-01-11)
      Announces decision to implement Alternative A of the project EA, supplementing existing in-stream large woody material for aquatic habitat enhancement within an 8.5 mile reach of the South Fork McKenzie River and lower ...
    • South Fork McKenzie River enhancement project environmental assessment 

      McKenzie River Ranger District (Or.) (2006-11)
      Responds to South Fork McKenzie Watershed Analysis findings of loss of early life habitat for bull trout and spring Chinook salmon by proposing to supplement existing in-stream large woody material for aquatic habitat ...
    • Spot salvage timber sale project environmental assessment 

      McKenzie River Ranger District (Or.) (2001-06)
      Proposes to fall 205 hazardous trees on 22 acres adjacent to state and federal highways, and include 171 trees in a salvage timber sale that would yield an estimated 100 thousand board feet. The remaining 34 trees, including ...
    • Trailbridge blowdown salvage project decision memo 

      McKenzie River Ranger District (Or.) (2007)
      Announces decision to implement project removing approximately 185 wind-thrown and root sprung trees from 17 acres located along the McKenzie River near a section of the McKenzie River National Recreation Trail above the ...
    • Trapper project decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2003-05)
      Announces decision to implement Alternative B from project EA, using timber harvesting techniques, prescribed fire, and snag creation methods to approximate stand structures resulting from historic high security, ...
    • Trapper project environmental assessment 

      McKenzie River Ranger District (Or.) (2003-03)
      Proposes to implement portion of recommendations found in the Blue River Landscape Strategy, a recommended landscape management and watershed restoration plan, an administrative study designed to measure effects on the ...
    • Two Bee landscape management project decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2006-12-07)
      Announces decision to implement Alternative B of the project EA, harvesting timber on 825 acres, yielding approximately 10.8 million board feet (MMBF). Includes moderate partial cutting on 591 acres, moderate partial cutting ...
    • Two Bee landscape management project environmental assessment 

      McKenzie River Ranger District (Or.) (2006-10)
      Proposes to harvest timber on 825 acres, yielding approximately 10.8 million board feet (MMBF). Includes moderate partial cutting on 591 acres, moderate partial cutting with multi-story objectives on 121 acres, commercial ...
    • Upper McKenzie boat launch projects decision notice and finding of no significant impact 

      McKenzie River Ranger District (Or.) (2007-06-14)
      Announces decision to implement Alternative 2 of the project EA, providing and maintaining opportunities for river-oriented recreation activities by relocating boat launches at Frissell and Bruckart launch sites, and ...
    • Upper McKenzie boat launch projects environmental assessment 

      McKenzie River Ranger District (Or.) (2007-02)
      Proposes to provide and maintain opportunities for river-oriented recreation activities by relocating boat launches at Frissell and Bruckart launch sites, and reconstructing the existing launch at Paradise. Includes ...
    • Upper McKenzie River aquatic restoration environmental assessment 

      McKenzie River Ranger District (Or.) (2004-02)
      Proposes supplementation of existing woody material to act as flow deflection and capture spawning gravels in the McKenzie River channel upstream of Trail Bridge Dam. Existing material would be supplemented with trees ...
    • West Fork Horse Creek Bridge rehabilitation project environmental asessment 

      McKenzie River Ranger District (Or.) (2002-06)
      Proposes to rehabilitate the 52 year-old West Fork Horse Creek Bridge on Delta Road, including structural repairs throughout, and replacement of portions of the deteriorated glulam truss members. A temporary bridge would ...