Browsing Forest Service by Title

Navigation

Display Options

Results

  • Detroit Ranger District (Or.) (2007-01)
    Announces decision to implement Alternative 5 of the project EA, implementing timber harvest on approximately 751 acres, modified by converting some of the regeneration units to thinning units, and altogether dropping two ...
  • Detroit Ranger District (Or.) (2006-11)
    Proposes to harvest timber in overstocked, managed stands over 40 years-old and overstocked, 100 year-old fire regenerated stands on about 985 acres, with commercial thinning on 926 acres and regeneration harvest on 59 ...
  • Malheur National Forest (Agency : U.S.); Umatilla National Forest (Agency : U.S.); Wallowa-Whitman National Forest (Agency : U.S.) (2006-09)
    Analyzes proposed assembled land exchange between Clearwater Land Exchange-Oregon and the Forest Service, involving acquiring and conveying within the Malheur, Umatilla, and Wallowa-Whitman National Forests. Plans to provide ...
  • Bend-Fort Rock Ranger District (Or.) (2007-06-25)
    Announces decision to issue a special use permit to BPA to construct a 140-foot communications tower within the existing BPA LaPine Substation. BPA will construct the tower and mount two microwave antennae onto the tower ...
  • Bend-Fort Rock Ranger District (Or.) (2003-08-11)
    Announces categorical exclusion of project replacing the 4-foot wide Bridge Creek bridge, which broke in the middle under heavy snow with a single log stringer bridge with handrails. Also includes replacing the aging Spring ...
  • Bend-Fort Rock Ranger District (Or.) (2002-04-10)
    Proposes to reconstruct 34 miles of existing trail, relocate approximately 2 trail miles that are located in areas of soil and erosion concern, construct about 3 miles of new mostly mountain bike trail, and provide signs ...
  • McKenzie River Ranger District (Or.) (2008-04-18)
    Announces decision to implement Alternative B of the project EA, to thin 2463 acres, yielding a gross estimate of 47.8 million board feet of wood products that would be sold over 3 years beginning in fiscal year 2008. The ...
  • McKenzie River Ranger District (Or.) (2008-03)
    Proposes to thin 2463 acres, yielding a gross estimate of 47.8 million board feet of wood products that would be sold over 3 years beginning in fiscal year 2008. The objectives would be to restore structural diversity in ...
  • Deschutes National Forest (Agency : U.S.) (1997-12)
    Provides analysis focusing on the three primary issues of the watershed: vegetative health and sustainability; increased recreational use and the associated resource impacts to wildlife, vegetation, soils, and water quality; ...
  • Detroit Ranger District (Or.) (2003-04-14)
    Announces decision to decommission .8 miles of road, including Road 2234-175 and its spurs to revegetate with forage seed and transplant trees at the entrance, providing a more effective barrier to off-highway vehicle use. ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2008-08)
    Assesses mine site on moderately steep side slopes, consisting of two adits, associated wasterock and tailing ponds, one with water treatment facilities and miscellaneous buildings. A Niton XLt unit found that all metals ...
  • Sisters Ranger District (Or.) (2001-10-01)
    Announces decision to implement Alternative 2 of the project EA, responding to the high mortality caused by the spruce budworm by thinning some 170,000 board feet of green trees on approximately 630 acres of forest stands ...
  • Lookout Mountain Ranger District (Or.) (2008-08)
    Proposes to reauthorize grazing and issue grazing permits for the Crystal Springs and Burn allotments, addressing the demand for livestock forage, and also the concerns over increased water temperature, decreased bank ...
  • Sisters Ranger District (Or.) (2000-05-30)
    Strategic document addresses the ecological significance of eastern Cascade disturbance regimes and the need to provide late-successional habitat conditions for species such as the northern spotted owl. The assessment ...
  • McKenzie River Ranger District (Or.) (2005-05)
    Proposes to implement a Master Plan that identifies a variety of improvements proposed to upgrade facilities and services for campers, comply with Americans with Disabilities Act and other special requirements, enhance the ...
  • Bend-Fort Rock Ranger District (Or.) (2004-02)
    Proposes to expand campground facilities at Rock Creek and Gull Point campgrounds. Includes constructing campsite access roads, new campsites and associated facilities, camp spurs, water lines and faucets, toilet buildings, ...
  • Lookout Mountain Ranger District (Or.) (2007-09-27)
    Announces decision to reauthorize livestock grazing under the same terms and conditions as the current grazing management, which is for 1100 ewe/lamb pairs from June 16 to September 30 for a total of 1177 Animal Unit Months ...
  • Blue Mountain Ranger District (Or.); David Evans and Associates; Duck Creek Associates (2003-06-20)
    Characterizes ecological and physical processes at multiple spatial scales by systematically uncovering the interactions of biological, physical, and human processes that have created current conditions. Identifies key ...
  • Blue Mountain Ranger District (Or.) (2006-07)
    Environmental assessment proposes to reduce fire hazard for an at-risk community in Grant County through the use of timber harvest, precommercial thinning, machine and hand piling, pile burning, and prescribed burning on ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2006-08)
    Assesses site consisting of four collapsed adits, one of which has water discharge, and 6000-80000cy of wasterock materials, most of which is adjacent to Granite Creek. There are numerous trenches and apparent hydraulic ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics