Browsing Local and Regional Documents Archive by Author "David Evans and Associates"

Navigation

Display Options

Results

  • Jefferson County (Or.); David Evans and Associates (Jefferson County (Or.), 1996-07)
    The preparation of the Jefferson County Transportation System Plan was a cooperative effort of Jefferson County, the Cities of Madras, Culver, Metolius, the unincorporated communities of Camp Sherman and the Crooked River ...
  • La Grande (Or.); Union County (Or.); Oregon. Dept. of Transportation; David Evans and Associates; Cogan Owens Cogan (Firm) (Oregon. Dept. of Transportation, 2006-03-29)
    The US 30: Gekeler Lane to I-84 Circulation and Access Management Plan (US 30 CAMP) describes existing traffic and land use patterns in the study area; identifies potential safety, access, and traffic congestion issues; ...
  • Lake County (Or.); David Evans and Associates (Lake County (Or.), 2002-12)
    The Lake County TSP was developed through a series of technical analyses combined with systematic input and review by the Transportation Advisory Committee (TAC), a local stakeholder group, ODOT, and the public. The TAC ...
  • Lincoln City (Or.); David Evans and Associates (City of Lincoln City (Or.), 1995-01)
    The purpose of this Transportation Master Plan is to provide a dynamic guide for implementing the goals and objectives identified herein relative to improved transportation facilities and services in Lincoln City in to ...
  • Lostine (Or.); David Evans and Associates (City of Lostine (Or.), 1997-06)
    The Lostine Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan ...
  • Madras (Or.); David Evans and Associates; Breazeale, George; Madras (Or.). Dept. of Public Works; Oregon. Dept. of Transportation. Planning Section (City of Madras (Or.), 1998-08-25)
    The Madras Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan ...
  • Public Financial Management, Inc.; McMinnville (Or.); David Evans and Associates (City of McMinnville (Or.), 1993-10)
    The City of McMinnville (the City) has commenced the development of an updated Comprehensive Plan for the area within its Urban Growth Boundary. This Transportation Master Plan for the City constitutes the background ...
  • Medford (Or.); Oregon. Dept. of Transportation; David Evans and Associates (City of Medford (Or.), 2007-09-18)
    An Interchange Area Management Plan (IAMP) is a planning document used to help protect the investment in an interchange over the long-term. The IAMP for the South Medford Interchange (SMI) is required by Oregon Administrative ...
  • Milton-Freewater (Or.); David Evans and Associates; Eggers, Gina; Swirsky, Karen (City of Milton-Freewater (Or.), 1999-06)
    The Milton-Freewater Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System ...
  • Monument (Or.); David Evans and Associates (City of Monument (Or.), 1997-06)
    The Monument Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the transportation ...
  • Mosier (Or.); Cogan Owens Cogan (Firm); David Evans and Associates (City of Mosier (Or.), 2003-05-12)
    This plan is intended to help guide the future growth and development of Mosier, focusing specifically on future transportation facilities and development in downtown Mosier along the Historic Columbia River Highway ...
  • Mount Angel (Or.); David Evans and Associates; Seder Architects (City of Mount Angel (Or.), 2001-06)
    Mt. Angel wants to enhance and promote its downtown. The challenge has been to keep the downtown friendly and local while making it more attractive to visitors. The City recognized the need to coordinate and expand previously ...
  • Mount Vernon (Or.); David Evans and Associates (City of Mount Vernon (Or.), 1997-06)
    The Mt. Vernon TSP was prepared as part of an overall project in Grant County that involved preparing individual plans for Grant County and the six communities of: Dayville, Long Creek, Monument, Mt. Vernon, Prairie City, ...
  • Multnomah County (Or.); Multnomah County (Or.). Dept. of Business and Community Services; David Evans and Associates (Multnomah County (Or.), 2005-06)
    The purpose of this Rural Area Plan is to guide decision making regarding land use, capital improvements, and physical development of the Multnomah County portion of the Columbia River Gorge National Scenic Area.... Multnomah ...
  • Myrtle Point (Or.); David Evans and Associates (City of Myrtle Point (Or.), 1995-05)
    The City's Pedestrian and Bicycle Plan coordinates with state and federal plans. It describes a system that can be implemented over 20 years. The Plan is guided by the Myrtle Point Pedestrian and Bicycle Advisory ...
  • Philomath (Or.); Cogan Owens Cogan (Firm); David Evans and Associates (City of Philomath (Or.), 1999-05)
    This Philomath Transportation Systems Plan (TSP) contains a 20-year transportation systems plan for the Philomath area. It contains plans for the different transportation modes in Philomath to meet state planning requirements ...
  • Pilot Rock (Or.); David Evans and Associates (City of Pilot Rock (Or.), 2001-06)
    The City of Pilot Rock Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System ...
  • Port of Portland (Or.); Portland (Or.). Bureau of Planning; Jacobs Consultancy; Alcantar & Associates; Cephas, Inc.; David Evans and Associates; DKS Associates; NEXTOR; Parametrix, Inc.; Synergy Consultants; Zimmer Gunsul Frasca (Port of Portland (Or.), 2008-09)
    This technical memorandum summarizes the aviation demand forecasts prepared for the 2010 Portland International Airport Master Plan Update. This technical memorandum also provides historical data on the regional population ...
  • Port of Portland (Or.); Jacobs Consultancy; HNTB Corporation; Alcantar & Associates; Cephas, Inc.; David Evans and Associates; DKS Associates; NEXTOR; Zimmer Gunsul Frasca; Parametrix, Inc.; Synergy Consultants; Portland (Or.). Bureau of Planning (Port of Portland (Or.), 2008-09)
    This technical memorandum presents an inventory of existing conditions (Inventory) related to the role of Portland International Airport (the Airport, or PDX) within the region, its current operations and facilities, and ...
  • Port of Portland (Or.); P&D Aviation; Century West Engineering Corporation; David Evans and Associates; DKS Associates; Synergy Consultants; Unison Consulting Group; Fletcher Farr Ayotte (Port of Portland (Or.), 2000-09)
    The objective of the Airport Master Plan is to provide a 20-year road-map for improvements at the Airport. The recommended development must satisfy aviation demand, yet be compatible with the environment, community ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics